Factory License & Safety Certificate (Form 4 / DISH Approval)

Mandatory industrial operating permit issued under Section 6 and Section 7 of the Factories Act, 1948 by the Directorate of Industrial Safety and Health (DISH) or Chief Inspector of Factories (CIF), approving plant machinery layouts, worker health, occupational safety, and hazardous manufacturing processes

Ministry of Labour and Employment - Factories Act →
📝 Prepared by: India Docs Portal (independent, not a government website)📅 Last updated: November 4, 2026✅ Sources: 2 official references listed below

Strict Applicability Threshold: 10 Workers with Electric Power

Under Section 2(m) of the Factories Act, any manufacturing unit employing 10 or more workers using electric power (or 20 or more workers without power) on any single day in the preceding 12 months is legally defined as a 'Factory'. Operating under a simple Shops and Establishment or Trade License once you cross this worker threshold is illegal, exposing directors to personal criminal prosecution.

Quick Answer: What Is a Factory License?

💡 A Factory License (issued in Form 4 under the Factories Act, 1948) is the primary legal authorization required to run any manufacturing plant in India. Issued by the Directorate of Industrial Safety and Health (DISH), it certifies that the factory building has approved machine spacing, adequate lighting, natural and mechanical ventilation, emergency escape routes, and mandated welfare amenities (drinking water, first aid, washrooms, and canteens for >250 workers). Operating a factory without this license is a criminal offense punishable by plant closure and imprisonment.

Factory License (DISH) vs. Municipal Trade License vs. Shops & Establishment Registration

Comparing statutory commercial operating licenses in India.

Operating PermitGoverning StatuteApplicable EstablishmentsPrimary Regulatory Focus
Factory License (Form 4)Factories Act, 1948Manufacturing plants employing >=10 workers with powerOccupational worker safety, machine guarding, ventilation, boiler inspections
Shops & EstablishmentState Shops & Commercial Establishments ActRetail shops, IT software offices, hotels, commercial agenciesWorking hours, weekly off, leaves, wage payment terms
Municipal Trade LicenseState Municipal Corporation ActAll commercial and trading activities inside city limitsPublic health, sanitation, waste disposal, civic zoning compliance
Boiler Registration CertificateIndian Boilers Act, 1923Steam boilers and high-pressure steam pipelinesAnnual ultrasonic thickness testing and safety valve calibration
âš ī¸ Important Acceptance Note: A manufacturing unit covered under the Factories Act is explicitly EXEMPT from the state Shops and Establishments Act.

Quick Information

âąī¸ Processing Time

Factory building plan approval takes 15 to 30 days; final Form 4 Factory License is issued within 30 days of physical machine inspection and statutory fee payment.

đŸ’ĩ Fees

Statutory fee scheduled on a graded scale based on total installed electric horsepower (HP / KW) and maximum number of workers employed on any single day (ranging from ₹1,000 to ₹50,000 per year).

✅ Eligibility

Designated Factory Occupier / Factory Manager who holds clear land title or registered lease deed in an approved industrial zone (MIDC, RIICO, GIDC, SIPCOT, UPSIDA), approved building plans, and installed industrial machinery compliant with worker safety standards.

Who Needs This Document?

Manufacturing industries, chemical processing plants, engineering fabrication workshops, textile mills, pharmaceutical facilities, and food processing factories employing 10 or more workers with power, or 20 or more workers without power.

Required Documents

  • Architectural factory site plan and machine layout drawings showing machine foundations, gangways (minimum 1.5m), and fire exits
  • Process Flowchart and brief manufacturing write-up describing raw materials, intermediates, by-products, and effluent generation
  • Consent to Establish (CTE) / Consent to Operate (CTO) from the State Pollution Control Board (SPCB)
  • Proof of installed electric power connection (connected load sanction letter in HP / KW)
  • Certificate of Structural Stability of Factory Building signed by an empaneled chartered structural engineer (Form 1A)
  • List of Directors / Partners with address proof and appointment of designated 'Occupier' under Section 2(n)
  • Fire Safety NOC from the Chief Fire Officer (CFO)

Step-by-Step Procedure to Obtain a Factory License (Form 4)

1

Stage 1: Factory Building Plan Approval (Form 1)

Submit building plans, machine layout, and process flowcharts online on your state's single-window industrial portal (e.g., DISH Maharashtra, Nivesh Mitra UP, Single Window Haryana) for plan scrutiny under Section 6.

2

Scrutiny of Machine Layout & Worker Safety

The Joint Director / Chief Inspector of Factories examines ventilation, lighting, machine guarding, dust extraction, and hazardous chemical pipelines, then issues the Plan Approval Order.

3

Physical Construction & Machine Installation

Construct the premises and install machinery strictly in accordance with the approved layout plan; install safety guards on all moving gears, belts, and pulleys.

4

Stage 2: Apply for Factory License Grant (Form 2)

Submit Form 2 (Notice of Occupation) at least 15 days before starting manufacturing operations, specifying installed horsepower and maximum workers.

5

Physical Inspection by Factory Safety Inspector

The Deputy Director / Factory Inspector conducts a comprehensive spot inspection: verifying machine guarding, pressure vessel test certificates, personal protective equipment (PPE), worker restrooms, and fire fighting equipment.

6

Issuance of Form 4 Factory License

Upon payment of the prescribed scale fee, the licensing authority issues the digitally signed Form 4 Factory License with a unique Factory Registration Number.

Factory License Amendment & Multi-Year Renewal

Procedures for increasing electric power load, adding workers, or renewing the license.

1

Apply for License Amendment on Portal

If installing extra machinery (increasing horsepower) or hiring more workers beyond the sanctioned quota, submit Form 2 for 'Amendment of Factory License'.

2

Pay Differential Graded License Fee

Pay the pro-rata differential fee online based on the newly expanded horsepower and worker bracket.

3

Multi-Year Renewal Option (Up to 10 Years)

Under recent ease-of-doing-business reforms, factory owners can renew their licenses for 5 or 10 years in advance by paying proportionate fees, avoiding annual bureaucratic filings.

4

Submit Annual Return in Form 27

Every factory occupier must submit an Annual Return (Form 27 / Unified Annual Return) detailing annual man-days worked, accident records, and welfare expenses by January 31 of each year.

â„šī¸ Failure to amend the license when expanding machinery or workforce constitutes illegal operation under Section 92 of the Act.

How to Download Form 4 Factory License Online

Download the official factory license certificate from the state DISH single-window portal.

1

Open State DISH / Labour Portal

Visit your state's Directorate of Industrial Safety and Health portal (e.g., dish.maharashtra.gov.in, lms.labour.gov.in).

2

Log in with Industrial Enterprise Credentials

Sign in using your industrial single-window login ID and password.

3

Navigate to 'Approved Factory Licenses'

Click on 'My Applications' > 'Factory Registration & License'.

4

Download Form 4 PDF Certificate

Download the official digitally signed Form 4 certificate displaying the factory name, occupier's name, approved horsepower limit, and worker quota.

â„šī¸ Under statutory factory rules, the original Form 4 license (or framed color copy) must be displayed prominently at or near the main entrance of the factory.

âš ī¸ Common Mistakes to Avoid

  • Altering machine layouts without obtaining revised plan approval — Relocating machinery or expanding production lines without prior DISH blueprint approval results in immediate prosecution under Section 92; factories face stop-work notices until as-built plans are compounded. Prevention: Submit an 'Amended Factory Plan' before altering machine placements.
  • Failing to test pressure vessels (boilers, air compressors, autoclaves) — Un-tested air compressor tanks and pressure vessels represent catastrophic explosion risks; factory inspectors will seal the compressor and penalize the occupier under Section 31. Prevention: Have all pressure vessels hydrostatically tested annually by a DISH-certified competent person.
  • Operating without personal protective equipment (PPE) for workers — Allowing laborers to weld without eye shields, handle molten metals without heat suits, or work at heights without safety harnesses attracts immediate suspension of operations and criminal liability upon injury. Prevention: Issue ISI-marked PPE and maintain a signed PPE distribution register.

Troubleshooting Factory Safety Audits & Inspection Queries

Standard solutions when factory inspectors issue non-compliance notices.

Inspector Query / NoticeFactories Act SectionActionable Remedial Measure
Notice issued for inadequate natural ventilation and ambient temperatureSection 13 (Ventilation & Temperature)Install industrial turbo-ventilators on roof ridges, exhaust blowers, and air-cooling ducting to maintain prescribed air changes per hour.
Absence of statutory Canteen for workforce exceeding 250 workersSection 46 of Factories Act, 1948Dedicate a hygienic dining space with clean drinking water and kitchen facilities as per statutory canteen specifications.
Occupier changed due to resignation of Managing DirectorSection 2(n) and Section 7(1) Notice of ChangeSubmit Form 2 along with the Board Resolution appointing the new resident Director as the designated 'Occupier' within 7 days of change.
💡 Tip: Under the Occupational Safety, Health and Working Conditions Code (OSH Code), single electronic licensing across multiple units will be unified.

Frequently Asked Questions

Who can be designated as the 'Occupier' of a factory under Indian law?

Under Section 2(n) of the Factories Act, 1948, in the case of a company, ONLY one of the directors of the company can be designated as the 'Occupier'. A company cannot designate a general manager or site engineer as an occupier to shield directors from legal safety liability.

Can a factory be set up in a residential zone?

No. Under municipal zoning regulations and town planning master plans, manufacturing units categorized under the Factories Act can ONLY operate in designated Industrial Zones, Industrial Development Corporation clusters (e.g. MIDC, GIDC, RIICO), or authorized industrial layouts.

What is the penalty for running a factory without a valid license?

Under Section 92 of the Factories Act, 1948, operating without a valid license or violating safety rules is punishable with imprisonment for a term up to 2 years, or with a fine up to ₹1,00,000, or both. In cases of fatal industrial accidents, the fine increases up to ₹3,00,000.

Is a Creche facility mandatory in a factory?

Under Section 48 of the Factories Act, in every factory where more than 30 women workers are ordinarily employed, a clean, well-ventilated creche room must be provided and maintained for the use of children under the age of six years.

Regulatory References & Official Sources

  • 📜
    Factories Act, 1948 —

    Comprehensive statute to consolidate and amend the law regulating labour in factories and occupational safety.

  • 📜
    Directorate General Factory Advice Service & Labour Institutes (DGFASLI) —

    Ministry of Labour technical wing coordinating industrial safety, occupational health, and inspection standards.

📄 Related Documents

Next Step

Issued by State Labour Departments through the Directorate of Industrial Safety and Health (DISH) or Office of the Chief Inspector of Factories under the Factories Act, 1948.

Ministry of Labour and Employment - Factories Act →
Try India Docs AI!